Agile, Scrum and Kanban Explained: Differences and How to Choose

Agile is a set of values; Scrum and Kanban are ways to work by them. Scrum roles and events, Kanban WIP limits, Scrumban, how it all looks in Jira and Plane, and where an IT team should start.

In short, in plain words
  • Agile is an approach in which a product is built in small pieces and results are shown often, instead of working to a plan for a year.
  • Scrum and Kanban are two ways to work like this: Scrum with a rhythm of short sprints, Kanban with a continuous flow of tasks and a cap on work in progress.
  • The type of work drives the choice: Scrum is closer to product releases, Kanban to support and requests.
  • First step: collect all tasks into one backlog and run one short iteration with a retrospective.

New to the topic? Start with the basics: What Is a Task Tracker and How to Choose One for Your Team

Agile is an approach to development in which a team ships the product in small increments, gets feedback often and adjusts the plan as it goes. Scrum and Kanban are the two most common ways to work according to this approach: Scrum organizes work around short sprints with fixed roles and events, while Kanban organizes it around a continuous flow of tasks on a board with a cap on work in progress.

This article is for founders, managers and team leads of IT teams in Kazakhstan who want to understand what’s behind these words and choose a working model for their team. We’ll cover Agile principles, how Scrum and Kanban work, how they differ, the Scrumban hybrid, how it all gets set up in a task tracker, and where teams usually stumble during implementation.

Agile: values, not a methodology

Agile emerged in 2001 as a response to long projects in which a team worked for months to a detailed plan, only to discover at the end that the client needed something else. A group of developers wrote the Agile Manifesto, built on four values:

  • Individuals and interactions over processes and tools.
  • Working software over comprehensive documentation.
  • Customer collaboration over contract negotiation.
  • Responding to change over following a plan.

The values come with twelve principles. A few matter most for a manager: deliver working software frequently, from a couple of weeks to a couple of months; welcome changing requirements, even late in development; measure progress by working software, not reports; regularly stop and improve your own process.

The key thing to understand: Agile doesn’t tell you how many meetings to hold or which columns to draw on the board. It’s a set of values. The specific rules come from the frameworks and methods built on top of it, primarily Scrum and Kanban. That’s why the phrase “we do Agile” by itself says nothing about how a team’s work is actually organized.

A common misconception is that Agile means working without plans or deadlines. It doesn’t. There is a plan, but it’s short and reviewed regularly, while long-term goals live in the product roadmap. There are deadlines too: a team that works in steady iterations forecasts them more accurately, because it relies on the actual velocity of past iterations rather than an estimate made six months ago.

Scrum: roles, the sprint, events and artifacts

Scrum is the most formalized of the Agile approaches. Its rules are described in the Scrum Guide; the current edition was published in 2020. The team works in sprints of no more than a month, in practice usually one to two weeks. At the end of each sprint, there should be a usable result.

Roles. The Scrum Guide calls them accountabilities. A team usually has no more than ten people.

Role Responsible for Typical mistake
Product Owner Product value, backlog order, the product goal The role is given to a director who has no time for it
Scrum Master A working process, removing impediments, coaching the team Turns into a secretary who takes minutes
Developers Creating the increment, the sprint plan, quality Wait for a detailed spec instead of taking part in planning

Events. The sprint is the container for the other four.

Event Duration per the Scrum Guide Purpose
Sprint planning Up to 8 hours for a one-month sprint, less for a two-week one Choose the goal and tasks for the sprint
Daily Scrum (daily) 15 minutes Check progress toward the sprint goal and impediments
Sprint review (demo) Up to 4 hours for a one-month sprint Show the result to the customer, update the backlog
Retrospective Up to 3 hours for a one-month sprint Find what to improve in how the team works

Artifacts and their commitments: the product backlog with the product goal, the sprint backlog with the sprint goal, and the increment with the Definition of Done. The sprint goal is often skipped, and that’s a mistake: without it, the sprint becomes a to-do list, and at the first urgent request nobody knows what can be postponed.

We explained in detail how to run sprints in a tracker day by day in our article on sprints and Agile delivery in Plane.

Kanban: flow, the board and WIP limits

Kanban came to software development from the Toyota Production System. Unlike Scrum, it has no roles, sprints or mandatory meetings. The Kanban Guide, whose latest edition was published in May 2025, describes three practices:

  1. Visualize the workflow. Map out the stages a task goes through and show each task as a card on the board.
  2. Actively manage work in progress. Cap it with WIP limits and make sure tasks don’t get stuck.
  3. Improve the workflow. Regularly look at the metrics and change the process.

The WIP limit is Kanban’s central idea. It caps the number of tasks that can be at a stage or with one person at the same time. For example, no more than two tasks “In Progress” per developer and no more than three tasks in “Review” per team. When the limit is reached, nobody picks up a new task: first you help finish what’s already started. It sounds counterintuitive, but this is exactly how the time from starting a task to delivering it gets shorter.

What a kanban board looks like

A kanban board for an IT team usually has five or six columns: “Inbox,” “To Do,” “In Progress,” “Review,” “Testing,” “Done.” The headers of working columns show the limit, for example “In Progress (4).” The “Inbox” column has no limit; everything new lands there, and once a day or once a week the team decides what moves to “To Do” and in what order.

A useful technique is horizontal swimlanes. The top lane is reserved for urgent tasks, like a production outage, and has its own small limit, for example one task per team. All other work goes in the regular lane. That way, urgent work doesn’t get lost, but it doesn’t eat up the team’s entire capacity either. If cards pile up before “Review” or “Testing,” that’s your bottleneck, visible without any reports.

The Kanban Guide suggests tracking four flow metrics: work in progress (WIP), throughput (how many tasks are finished per period), work item age and cycle time (how long a task took from start to done). For a manager, the last one is the most intuitive: it answers the client’s question “when will it be ready?”

Scrum vs Kanban: the differences

Criterion Scrum Kanban
Cadence Fixed-length sprints Continuous flow
Planning At the start of each sprint As capacity frees up
Roles Product Owner, Scrum Master, Developers Not defined, existing roles are used
Mandatory meetings Planning, daily, review, retrospective None, the team decides
Changes to the work Sprint scope is kept stable where possible A new task can be picked up at any time
Limiting work By sprint scope By WIP limits at each stage
Key metrics Sprint goal achievement, team velocity Cycle time, throughput
Best for Product development with regular releases Support, DevOps, a stream of requests and bugs

A short rule of thumb. If the team can plan two weeks ahead and there isn’t much urgent work, Scrum will give it rhythm and predictability. If more than half of the work arrives unexpectedly and can’t wait for the next sprint, Kanban is more honest: it doesn’t pretend a plan exists.

Neither approach is better overall. Different teams in the same company can work differently: product development in sprints, support and DevOps with Kanban. What matters is that within one team the rules are consistent and clear to everyone, and that the manager sees both pictures in one tracker.

Scrumban: when you need a hybrid

In practice, many teams end up with a mix of the two approaches, called Scrumban. From Scrum, they take regular planning, reviews and retrospectives. From Kanban, a continuous flow of tasks and WIP limits.

Scrumban works well in three situations:

  • The development team also supports the product and gets urgent bugs every day.
  • An IT agency runs several client projects, and priorities change more often than every two weeks.
  • The team is moving from Scrum to Kanban or vice versa and doesn’t want to break everything at once.

A typical setup: once a week or every two weeks, the team holds a short planning session and refills the “To Do” column, tasks are pulled according to WIP limits, urgent work gets a separate lane on the board with its own limit, and the retrospective happens on schedule. We covered how to set up a flow of bugs and urgent tasks with priorities and SLAs in our article on bug tracking and workflow.

What it looks like in a task tracker

You can run Agile on a wall of sticky notes, but as soon as the team works remotely or there’s more than one project, you need a tracker. Below is how the concepts map in the two systems IT teams in Kazakhstan choose most often.

Concept Jira Plane
Product backlog Project backlog Project backlog
Sprint Sprint on a Scrum board Cycle
Large feature Epic Epic as a work item type, Module
Kanban board Project Kanban board “Board” layout
WIP limit Column constraints on the board A team rule, monitored through views
Reports Burndown, velocity, cumulative flow diagram Cycle progress, dashboards
Search and filters JQL PQL

Setup starts the same way in both: four or five statuses that reflect real stages, one backlog and clear work item types. The mistake is trying to configure everything the tool can do right away. For a comparison of Jira and Plane on other criteria, see our article Plane or Jira in 2026.

Typical implementation mistakes in Kazakhstan IT teams

In our implementation experience, teams stumble not over theory but over habits.

  • Scrum for Scrum’s sake. The company introduces all the events but doesn’t change how decisions are made. The daily becomes a status report to the manager, the retrospective a formality with no changes.
  • A Product Owner without authority. The role formally exists, but the founder still changes priorities in private messages with developers.
  • A sprint without a goal. Everything that has piled up gets thrown into the sprint, and half the tasks are closed by the end.
  • The backlog lives in several places. Some tasks are in the tracker, some in a chat with the client, some in the team lead’s head.
  • Kanban without limits. The team calls its board kanban, but everyone has six tasks “In Progress” and none of them gets finished.
  • Retros without actions. Problems are discussed every two weeks but no changes are made. Two months later, the team stops holding retros.

Kazakhstan context. A strong WhatsApp culture breaks Agile more often than anything else. A client or manager messages a developer directly, the task goes into work bypassing the backlog, and the sprint plan stops meaning anything. A working rule: any request from a messenger becomes a task in the tracker, and the Product Owner decides whether to take it into the current sprint. The second local nuance is teams distributed between Almaty, Astana and remote work, plus bilingualism: it’s best to hold dailies and retros in a single video channel on a schedule and agree in advance on the language for tasks in the tracker, so the descriptions are clear to everyone.

Where to start: a plan for the first month

Week What we do Outcome
1 Collect all tasks into one backlog, choose Scrum or Kanban, agree on statuses One backlog, 4–5 statuses, a Product Owner assigned
2 First sprint or launch of a kanban board with WIP limits The team works only from the tracker
3 15-minute dailies, the rule “chat requests only through a task” Urgent work is visible on the board, not in messages
4 Demo of results and the first retrospective, one or two process changes Clear what works and what to change

Don’t try to implement everything at once. One team, one backlog and one month of honest work will give you more than a three-day methodology training for the whole company. We described the overall path from tasks in messengers to a proper system in our article how to implement a task tracker in a company.

How we do it

We start with a diagnostic: what kind of work comes into the team, how much of it is urgent, who makes priority decisions and where tasks live today. Based on that, we propose a model (Scrum, Kanban or Scrumban) and a minimal tracker setup for it, usually in Jira or Plane. Then we run a pilot with one team for two or three sprints or a month of Kanban, hold the first planning sessions and retrospectives together with the team, and only then roll the approach out to the other teams.

If you want to build your Agile process together with the tracker rather than separately from it, see our Jira and Plane task tracker implementation page: it describes the process, timelines and what’s included in the deliverables.


Sources. Agile Manifesto: agilemanifesto.org. Scrum Guide 2020: scrumguides.org. Kanban Guide 2025: kanbanguides.org. Plane repository: github.com/makeplane/plane.

Terms in plain words

Agile
A set of development values and principles: short iterations, frequent feedback, willingness to change the plan. Not a methodology but a way of thinking.
Scrum
A framework for working in short sprints with three roles, five events and three artifacts. It gives the team a rhythm for planning and releases.
Kanban
A method for managing the flow of work: visualizing stages on a board, limiting work in progress and continuously improving the process.
Sprint
A period of work of no more than a month, usually one to two weeks, with a goal and a set of tasks. At the end, the team shows the result.
Product Owner
The person responsible for the product’s value and the order of items in the backlog. Decides what the team works on first.
WIP limit
A cap on the number of tasks in progress at the same time. It forces the team to finish what it started and exposes process bottlenecks.
Retrospective
A meeting at the end of a sprint where the team discusses what got in the way and picks one or two changes for the next sprint.
Scrumban
A hybrid of Scrum and Kanban: regular planning and retrospectives plus a continuous flow of tasks with WIP limits.

FAQ

Quick answers

What is Agile in plain words?

Agile is an approach to development in which a team ships the product in small increments, gets feedback quickly and adjusts the plan as it goes. It is described in the 2001 Agile Manifesto through four values and twelve principles. Scrum and Kanban are specific ways of working according to this approach.

What is Scrum?

Scrum is a framework in which a team works in short sprints of no more than a month, most often one to two weeks. It has three roles (Product Owner, Scrum Master, Developers), five events (the sprint, planning, the daily, the review, the retrospective) and three artifacts (product backlog, sprint backlog, increment). The rules are set out in the official Scrum Guide.

What is the difference between Scrum and Kanban?

Scrum splits work into sprints with a fixed set of tasks and mandatory events. Kanban works as a continuous flow: tasks are picked up as people free up, and the amount of work in progress is capped by WIP limits. Scrum fits product development with releases better, while Kanban suits support and a stream of requests.

What is a kanban board?

A kanban board consists of columns for the stages of work, such as “To Do,” “In Progress,” “Review” and “Done,” and task cards that move from left to right. Columns have limits on how many tasks can be in progress at once. The board shows where work piles up and what is slowing down the flow.

What is a WIP limit?

A WIP (work in progress) limit caps the number of tasks that can be in progress at the same time at a stage or for one person. For example, no more than two tasks “In Progress” per developer. The limit forces the team to finish what it started and quickly exposes bottlenecks.

Should a team choose Scrum or Kanban?

If the team builds a product with regular releases and can plan two weeks ahead, start with Scrum. If more than half of the work is urgent requests and bugs that can’t wait until the next sprint, choose Kanban. Many teams eventually arrive at a hybrid, Scrumban.

How long does it take to implement Scrum?

You can start the first sprint after a week of preparation. In our experience, a team needs three to four sprints for planning to become more accurate and for the events to stop feeling like extra meetings. Regularity and honest retrospectives matter more than speed.

Do you need a task tracker for Agile?

For a team of three or four people in one office, a physical board is enough. As soon as people work remotely, there’s more than one project or you need reporting, you can’t do without a tracker. Jira and Plane support both sprints and kanban boards.

Related services

How Gotomarket helps with this

01

Jira and Plane task tracker implementation in Kazakhstan

Jira, Plane and other task tracker implementation in Kazakhstan: process audit, workflow design, Jira-to-Plane migration, self-hosting on local servers, team training.

About the service
02

Twenty CRM and amoCRM implementation in Kazakhstan

Twenty CRM and amoCRM implementation for IT and B2B companies in Kazakhstan: pipeline, import, self-hosting on local servers, integrations, Plane, Jira and AI.

About the service
03

Business automation and AI in Kazakhstan

Business automation in Kazakhstan: Jira and Plane task trackers, CRM implementation, integrations, AI website bots, employee assistants, Chat with Data and support automation.

About the service

More on the topic

All posts in this section

Bug Tracking: Workflow, Priorities and Fix SLAs

How to set up bug tracking in Plane or Jira: a Bug type with required fields, a short workflow, a severity and priority matrix, fix SLAs, intake from support and Sentry, and team metrics.